For the replacement of a discontinued visualisation system, the complete visualisation was newly created, including highly system-specific functions that had been implemented over the years. The connection to the existing control system was made via a wrapping layer and allowed the greatest possible flexibility with a high degree of standardisation. The Deleproject framework was used as a basis.