When the factory was newly built, the product dissolving, inline dosing and subsequent evaporation were designed and a Functional Design Specification (FDS) was created. Based on this FDS, the PLC and control system (Siemens and WinCC Professional) were implemented after the review. Commissioning was carried out in a separate project.