As part of an extension to the factory building, this project included the automation of the building ventilation and the control of room temperatures, room humidity and room pressure for highly hygienic zones. The ventilation system comprised 4 monoblocks and distribution over 4 floors. As FDA compliant products are manufactured in this part of the factory, the ventilation system also had to be qualified to this standard.