After the concept phase with the design of the sequences, the sequences and functionalities were implemented and tested. Since this was a prototype system, various modifications were made during commissioning to optimize and accelerate the process. Deleproject's own framework for PLC (Siemens TIA) and HMI (zenon) was used.