As part of the retrofit, the old Areadat PLC including control cabinets was replaced and equipped with a modern Siemens TIA Portal control system and a WinCC Professional control system. All sequences were newly implemented and optimized. The retrofit and commissioning took place in the summer maintenance window within 2 weeks.