Project

CIP2 Extension

An existing Cleaning in Place (CIP) station was extended. In several phases, all electrical elements were renewed. Then several cleaning circuits were transferred from an older cleaning station to this system. The main challenge was the integration into two systems with different control and HMI generations. Finally, the interruptions for rebuilds and commissioning were always relatively short.

previous
close
next
Nestlé