Project

Line 2 Foreign Body Protection

The existing mixer line 2 was equipped with a vibrating sieve and magnet at its outlet to remove foreign bodies. All documents and applications of the previously newly implemented line were added. The electrical cabinets were converted by local specialists and commissioning was carried out via remote connection.

previous
close
next
Nestlé Dubai Manufacturing LCC